The quantum of ISTS lines and transformation capacity picked up sharply during the April-October period of FY25.
The National Committee on Transmission is soon expected to deliberate on whether GIS (gas insulated switchgear) technology would be a better alternative to the originally proposed air-insulated substation, in connection with transmission systems planned for wind energy evacuation offshore Tamil Nadu.