Schneider Electric and ETAP have announced the integration of EcoStruxure Power Operation with ETAP Operator Training Simulator (eOTSTM) and ETAP Power System Monitoring & Simulation (PSMSTM) enabling model-driven power system training and predictive analysis for operators and engineers.
This unique integration allows all EcoStruxure Power Operation systems to connect with ETAP Electrical Digital Twin on a continuous real-time basis. With this connection, operators can create and understand power system behavior during various real-world or plausible operating scenarios. New operating procedures may be designed and validated against contingencies utilizing their familiar EcoStruxure Power Operation human-machine interface without the risk of affecting actual operations – all thanks to the underlying ETAP eOTS simulation and analysis platform
Unplanned shutdowns
Forty per cent of unplanned shutdowns are due to operator missteps. Allowing power system engineers to anticipate potential failures and plan future systems expansions has real business impact as a lack of power system intelligence can cause huge financial losses. Oil and gas platforms experience up to $3 million in losses for every outage, a single electrical event in the semiconductor industry means a $3.8 million loss, while for hospitals, it’s roughly a $1 million loss per 8-hour outage. Using cutting-edge technology to improve system planning and design, recognize and correct potential hidden problems, and avoid unforeseen errors can prevent these costly system disruptions.
Also read: Schneider Electric Launches EcoStruxure Grid In Hyderabad
Live system data
The ability to use live system data from Schneider’s EcoStruxure Power Operation to feed the Electrical Digital Twin significantly reduces system downtime and drives more accurate decision-making, along with reduced safety risks, deeper learning, and quick response time, a release from Schneider Electric said.
Featured photograph is for representation only.