In a project awarded by the Dubai Electricity and Water Authority (DEWA), Linxon has successfully designed, supplied, constructed, installed and commissioned the 8-bay 132kV Abraj gas insulated substation (GIS). Located in the central professional district of Business Bay, the Read more
Linxon has announced that the Sanad substation that it build for Dubai Electricity & Water Authority (DEWA) is now operational. In a release, Linxon said that its engineering of the Sanad substation, located in the rapidly developing Jebel Ali Read more
The transmission system operator, TransnetBW GmbH, has awarded Linxon a contract for its Beuren AIS substation as part of Baden Württemberg’s transmission network upgrade and Germany’s acceleration to a greener grid. Linxon Germany has commenced work with the transmission Read more
A major milestone has been reached in the construction of a new 400kV electricity substation in Bengeworth Road, Lambeth with teams from National Grid and Linxon making a start on the construction of the substation. The new substation in Read more
Available Power and Linxon announced a strategic partnership to scale the North American energy storage market. Linxon has already secured access to the necessary equipment supply to deliver on the first tranche of Read more
Linxon has been chosen by Swedish distribution system operator, Vattenfall Eldistribution, to deliver 400kV, 220kV and 132kV substations in Hagby in northern Stockholm. With commissioning planned for spring 2025, the new contract involves building a brownfield 132kV station (comprising Read more
Linxon has been awarded a contract by Chennai Metro Rail Ltd (CMRL) to deliver the power supply works for Phase 2 development of the Chennai metro. This newly awarded contract is part of Phase 2, which will significantly increase Read more
Hitachi Energy and Linxon are collaborating to strengthen London Power Tunnel (LPT), a key power infrastructure project that will ensure reliable, clean electricity supply for England's capital city. To support National Grid in accelerating its net zero targets, Read more
Linxon, in a recent statement, said that it has commissioned a 400kV air insulated substation (AIS) for Tata Power Solar in Rajasthan. The project was part of the Ministry of New & Renewable Energy’s CPSU Scheme where Central public Read more
In this case study, Arjun Singh, Project Manager, Linxon India, recalls the infrastructural and Covid-related challenges surmounted during the successful completion of Nepal’s first 400kV GIS substation located at Dhalkebar and commissioned by Linxon for Nepal Electricity Authority. The Read more