German transmission system operator Amprion has selected NKT to provide high-voltage alternate current (AC) and direct current (DC) onshore power cable systems for the ongoing expansion of the German power grid. With the award of these two specific turnkey Read more
NKT has signed the order for the power cable system for the Polish offshore wind project Baltic Power. NKT, in June this year, had announced that it was finalizing the contract with Baltic Power Sp. z.o.o. Now, NKT has Read more
Established in 1891, NKT is a global pioneer in the field of cables with a complete product range that spans low, medium, high and extra high voltage cables, as well as Read more
NKT has been mandated to supply offshore export power cables, accessories and undertake cable installation for the Dogger Bank C offshore wind farm in the North Sea It may be recalled that in November last year, NKT had entered Read more
NKT, in a release, said that it has entered into a Preferred Supplier Agreement (PSA) as main contractor for delivery and installation of high-voltage DC onshore and offshore export cable systems to an European offshore wind farm. Contract involves Read more
NKT has been awarded its largest order ever -- of over 1 billion Euros .Placed by TenneT and TransnetBW, the contracts comprise the supply and installation of a 525kV XLPE high-voltage DC (direct current) onshore cable system with Read more