Tata Power has received approval from the Maharashtra Electricity Regulatory Commission (MERC) to install a 100 MW Battery Energy Storage System (BESS) in Mumbai over the next two years.
The entire 100 MW system will be installed across 10 strategically located sites, especially near load centres across Mumbai Distribution, centrally monitored and controlled from Tata Power’s Power System Control Center (PSCC), Tata Power said in a release.
The cutting-edge BESS, equipped with advanced ‘black start’ functionality, will enable a swift recovery of power supply to critical infrastructure, including the metro, hospitals, Airport, and Data Centers, in case of grid disturbances. This will prevent large-scale blackouts and enhance Mumbai’s power network resilience. Additionally, the system’s sophisticated technology will optimize reactive power management, improving peak demand efficiency and strengthening the city’s power infrastructure.
With high ramp-rate capability, the BESS will facilitate peak load management, ensuring a stable and balanced power supply even during high-demand periods. It will also help reduce power purchase costs by storing energy during low-cost periods and utilizing it during high-cost peak hours thereby ensuring reduced tariffs for consumers in the future. Furthermore, the BESS will support capital expenditure (capex) deferral by minimizing the need for costly infrastructure upgrades and efficiently managing load fluctuations with stored energy.
Beyond enhancing grid reliability, the BESS will offer ancillary services, including frequency regulation and voltage support, further strengthening grid stability. It will also enable better utilization of solar energy by storing surplus daytime power and making it available during peak demand, ensuring optimal renewable energy integration with an increase in Green Energy consumption. Additionally, Tata Power’s BESS deployment will also fulfil energy storage Obligations.
Future plans include the integration of BESS into the Distributed Energy Resource Management System (DERMS) to enhance operational efficiency. Tata Power remains committed to “Safety First”, incorporating three layers of temperature monitoring and fire suppression systems at the cell, module, and rack levels within the BESS. The system will have high round-trip efficiency with reduced auxiliary consumption, thereby enhancing operational performance and extending the storage system’s lifespan to support Mumbai’s energy sustainability goals.
Also read: Tata Power-DDL continues to ensure stable power supply
Featured photograph (source: Fluence) is for representation only